Projects
This page highlights some real-life examples of our work. Click on a project to view more detailed information.
Longannet Power Station, Scotland
June 2010
- 3m high Gallagher Electric Fence secured to 2.4m high chain link fence
- Various single and double leaf gates
- CCTV system provided by Siemens Ltd
Waitrose Shopping Centre
November 2009
- 637mtrs of Ecohoard Re-Plas
- 3 x pedestrian gates
- 3 x double leaf gate
Hamilton Mausoleum
September 2009
- 270 mtrs of 2.4 mtr high self-raking railings
- 1 x 3 mtr double leaf gate
- 1 x 1.2 mtr wide single leaf gate
National Grid, Bramley
December 2008
- 1150m Steel Palisade Fencing, with Concrete Cill
- Multiple access gates all with electric fencing fitted
Clifton Suspension Bridge Trust - Bristol
August 2008
- 23 metres of 2.4m high Darfen Steelhoard
- 1 x Vehicle gate
- 2 x Pedestrian gates
Aintree Racecourse
May 2008
- 250m of 2.4m high Triton welded mesh fencing & gates
- 60m 2.4m high close board timber
- 227m of chain link fencing & gates
- Three Delta Cantilever gates
- 7m wide electric swing barriers
- Various repair works and emergency repairs
Eggborough Power Station
April 2008
- 12,000m approx of 2.7m high Zenith Security System
- 12,000m approx of Razor Tape Security Toppings
- 15 Double leaf gates of various sizes
- 2 single leaf pedestrian gate
Deed Street, Airdrie
March 2008
- 92 metres of 1.2 m high Triton fencing
- 373 metrers of 1.8m high Triton fencing
- 22 self-closing Triton gates









