Projects
This page highlights some real-life examples of our work. Click on a project to view more detailed information.
Coldhurst Hall, Oldham
December 2005
- Approx 240m of heavy duty vertical bar railings with finial tops
- 5 pedestrian access gates
- 3 delta cantilever sliding gates
Newmarche Drive
October 2005
- Approx 114m of Steelhoard
- 1 Double Leaf Gate
- 2 Pedestrian Access Gates
- Approx 119m Barb Wire
Hallam FM Arena, Sheffield
April 2005
- Approx 140m of 2m high bow top self raking railings
- 2 Double gates
- 1 Single gate
Barr Construction
June 2004
- 338m Steelhoard
- 3 x Double leaf gates
- 1 Pedestrian Access Gate
- Barb-wire extensions
Henley Golf and Country Club
February 2002
- security road blocker 3m wide by 500mm high
- automatic bollards
- timber post
- rail fencing with matching gates









