Project Focus: Newmarche Drive

October 2005
Equipment Installed
- Approx 114m of Steelhoard
- 1 Double Leaf Gate
- 2 Pedestrian Access Gates
- Approx 119m Barb Wire
Client Goals
To provide a secure compound during the refurbishment of 220 bungalows.
Darfen Solution
Darfen Steelhoard is a 2.4m high solid metal site hoarding system used to provide security to construction and house builders’ sites throughout the UK.
Designed specifically to provide site security, the system is installed directly into the ground with the use of spigots in order to form a solid barrier around the site, which will also withstand winds of up to 50 miles per hour. The Askern site took advantage of extra security measures by adding to the height of the compound with the addition of 0.6m high barb wire extensions, therefore taking the full height of the fence to 3m. Whilst a Darfen Steelhoard compound provides unrivalled security to a site, a large attraction to the system is its aesthetic appeal.
The solid steel components will not burn, rot or degrade unlike timber systems, and the profiled sheets help to deter bill stickers and graffiti artists, therefore leaving a long, uniform run. In this instance, the hoarding remained the standard white, however the sheets can be painted in relevant colours to reflect corporate identity and brand image.


Customer Comment
Danny McCarthy, the site agent for Bramall Construction said “The site looks good and professional and has provided the security we needed. I was impressed with the guys that installed it. The speed of installation, the quality and their attitudes were excellent.”